Tonight and Wednesday night, drivers approaching the northbound South Grand Island Bridge may experience something that daytime motorists encounter all too often – a delay.
The State Thruway Authority reports that northbound traffic will be stopped for about 10 minutes at a time while crews replace the overhead lane signals on the bridge between 11:30 p.m. and 3:30 a.m.
Motorists will be halted at the toll plaza until lanes on the bridge can be reopened. The work began Monday night. If weather is bad, further work may be postponed.
The State Thruway Authority reports that northbound traffic will be stopped for about 10 minutes at a time while crews replace the overhead lane signals on the bridge between 11:30 p.m. and 3:30 a.m.
Motorists will be halted at the toll plaza until lanes on the bridge can be reopened. The work began Monday night. If weather is bad, further work may be postponed.